GWIC played a crucial role in the Malembo Development Center (MDC) project in Cabinda, Angola, providing both Engineering Design and Construction Supervision for this vast 141-hectare development. The MDC, designed to support the Oil and Gas industry, includes 1,440 residential units, along with comprehensive infrastructure such as communication networks, logistics facilities, laundry services, medical centers, and recreational amenities. GWIC’s contribution ensured the successful realization of a self-sustaining development that meets the needs of both the industry and its workforce.