GWIC delivered expert Engineering Design services for Chevron’s Malongo Base project in Cabinda, Angola. The project required precise topographic and geotechnical surveys, leading to the development of advanced stabilization designs for three ravines, including emergency slope protection solutions. In addition, GWIC devised a robust structural plan to replace an aging retaining wall along the coastal Nalco Area. Our comprehensive engineering solutions safeguarded the infrastructure, ensuring long-term stability and protection of critical assets in this high-risk area.