Hidroeletric Power Station of The Angel River

GWIC provided Engineering Design and Construction Supervision for the Angel River Hydroelectric Power Station in Alajuela, Costa Rica. The project consists of two independent power generation units, Angel 1 and Angel 2, each with a capacity of 5 MW. Key components include the construction of diversion dams, a water intake system, a 100,000 m³ reservoir, and a 1-kilometer water adduction pipeline, as well as engine rooms covering 1,000 m². This renewable energy project contributes to Costa Rica’s sustainable power generation, reinforcing GWIC’s role in environmentally friendly infrastructure development.

Client

El Ángel S.A.

Year

2015 – 2016

Location

Alajuela, Costa Rica

Services

Design Services and Construction Supervision