GWIC developed and managed the rehabilitation project for a two-bay pavilion and a car wash building within the Luanda Naval Base complex for the Angolan Navy (MGA). The refurbished facilities cover a surface area of 1,356 m². The pavilion, designated for the maintenance and repair of light vehicles, underwent extensive upgrades including a renovated roof, cleaned, polished, and painted floors, repainted interior panels, a newly installed storage access door, a compressed air line, and enhanced lighting. Additionally, the interior walls were repaired and repainted to restore the facility’s operational efficiency.