GWIC provided Engineering Design for the Malange Thermal Power Plant, which includes seven energy production units located on an 8,700 m² plot. The project also involved constructing administrative and technical support buildings and a secure peripheral wall to safeguard the facility. This strategic infrastructure project is vital for energy generation in the region, ensuring reliable power supply and operational safety.
Client
ENE – Empresa Naciona de Electricidade de Angola e Energia