GWIC engineering the future

Vista Club Building

GWIC was tasked with overseeing the inspection of false ceilings in the VISTA Club building, located in Ingombota, Luanda. Constructed in 2015, this 19-floor building, with 2 basements and 120 apartments, required a thorough inspection and certification process to identify non-conformities and assess the integrity of the false ceiling system. GWIC provided expert recommendations for necessary corrections and repairs to ensure the building’s quality. All inspection and remediation work was performed by qualified teams using certified equipment, in full compliance with legal requirements and prioritizing companies with an Integrated Management System.

Client

Totalenergies EP Angola

Year

2023

Location

Luanda, Angola

Services

Construction Supervision

Other Projects

Maternity Hospital in Cabinda

ALGOA Industrial Park of Malembo

New Basilica Of Muxima