Huawei Angola Data Center

GWIC played a crucial role in the design of both the primary and backup data centers for Huawei in Luanda. The primary center consists of data center containers, power modules, and an IT equipment module, along with a workspace for the maintenance team and a campus with various support facilities. The backup center includes a power room equipped with UPS and battery cabinets, an equipment room housing a modular data center, and a campus with essential facilities. The entire deployment area spans 6,100 m². The primary data center is designed with a total power and cooling capacity of 1.04 MW of white space, while the backup data center provides 0.24 MW of white space capacity.

Client

Huawei Technologies Angola

Year

2022 – 2023

Location

Luanda, Angola

Services

Design Services